Special Care Nursery is nearing completion

The Special Care Nuresey renovations started last spring and now they are almost complete. Soon this reimagined space will be in use. A ribbon cutting is planned for September. Stay tuned!

Small Wins for GGH and our Community

While it still looks like a construction site, a lot of progress has been made in the Special Care Nursery renovations:

  • A lot of work has been done and will continue on the mechanical and electrical rough-ins.
  • Three headwalls (a hospital system that combines electrical and medical gas functions while effectively managing the cords and tubing) have been installed so far.
  • Drywalling has started in many areas.
  • Work on the Family Birthing Unit Operating Room such as floor leveling, taping, and painting will commence very soon.

We can’t wait to update you when the Family Birthing Unit Operating Room will be ready to be altered into a clinical area. Stay tuned!

It’s Moving Along!

Mechanical and electrical rough-ins are well underway. The body of the OR hoard system has been installed.  Sections of HVAC ducting and heating lines have had pressure tests completed with documentation to be distributed. The sprinkler contractor has their materials on-site and is starting installation next week.

In the photo on the right, patient rooms with windows line the right side of the hallway. Below, just some of a large amount of infrastructure will end up tucked above a suspended ceiling.

Old Special Care Nursery Now a Blank Canvas

With the demolition complete and the area cleaned out, our Special Care Nursery could be safely toured. Facilities Director, Dwayne Shelswell provided the hard hats and acted as guide to Kim Towes, Senior Director Patient Services and Karen Suk-Patrick, VP People and Support Services.

The empty space brought home the extent of the transformation. This isn’t a remodel but a complete reimaging of the space. In fact, if it weren’t for the wall of windows in one of the photos below which used to be one side of the hallway, it would be difficult to tell this space was once home to our Special Care Nursery.

The new layout (floor plan below) has been marked on the floor so work can begin on installing plumbing to connect to sanitary lines, says Dan Brzak, Director Redevelopment and Planning. “We are engaged in meetings with the contractor, our clinical teams and support teams like IT, Environmental and IPAC. Through this work we will establish a phasing plan and timelines to safely allow work to continue.”

The project’s floor plan shows the new SCN layout. To give a sense of the scale of the change, highlighted in blue is where the old hallway was located (click on image to enlarge).

Donors Make Impact

Special Care Nursery donors were invited to tour the space on April 28 and 29, just prior to demolition work beginning. In fact, several had a hand in giving it a start with a ceremonial sledge hammer. For the 9 donors who attended over the two days, they have a clear comparison point for when the work is complete in 2023.

Relocating The Operating Room

The operating room for Caesarean Sections and recovery is going to be completely redone with the renovations. As planned, GGH teams relocated the operating room from the Family Birthing Unit down to the third floor on the main OR level for the duration of the renovation.

Moving Day for the Special Care Nursery

On April 25th, GGH teams worked together to move everything from the old Special Care Nursery to the temporary Special Care Nursery located in the Pediatrics Day Surgery area. This meant it was moving day for our smallest patient, baby Brian. Brian was unaffected by the excitement filling the air as he seemed to sleep through it all. With the old area now completely vacant, work can begin on its complete renovation. Expected to take about a year, the first step will be putting up construction hoarding.

First Step: Setting Up a Temporary Special Care Nursery

Work is steadily underway to transfer our Special Care Nursery to a temporary location while we completely transform and expand its original space. The completed nursery will be amazing! Still, a bit of disruption has to happen ahead of that, though we know it will all be worth it.

Before construction can begin, the Hospital is taking steps to ensure that there is no disruption to the specialized care provided by the Special Care Nursery.

It took a great deal of work to transfer the Special Care Nursery to a temporary location in the Paediatric Day Surgery area.

Many electrical, IT and security items needed work for the completion of the temporary construction in the Paediatric Day Surgery area to accommodate the needs of the Special Care Nursery.

Temporary construction hoarding was installed to separate the messy construction from the rest of the patient care space. These are critical measures GGH must ensure are in place in order to keep patients and staff safe during construction.

Below is a gallery of “before” pictures. Watch as we get closer to the “after” images of this exciting new space.